BCC Blast Vibration Monitoring: The location of the BCC MCQ monitor is at the same address, 3 Sir Samuel Griffith Drv (#3SSGD).
Private Home Vibration Monitoring: The location is #3SSGD Home Outdoor Patio.
Private Home Monitoring Process: Defined Process listed here for Blasting and Noise.
Modified Instantel USBM Fatigue Chart: Shows the Instantel Minimate generated chart with the 50% tolerance margins added.
Click on Image, then Use Left and Right Keyboard Arrows to sequence through slides.
Saros Instantel MiniMate Full PDF Page Documents:
The first measurement done on the 7th December was a test measurement with a slightly incorrect transducer direction.
On the 31st May a simultaneous private home measurement was done at Birdwood Tce which measured approximately the same value as that reported by the BCC for Mt Coot-tha Rd.
- This indicated that the blast vibration threat exists for all Mt Coot-tha Local Residents, including the Stuartholme Historic buildings and Toowong Cemetary Grave Monuments.
Instantel Minimate Report # BE14105, Dec 7 _17 13_07_39.pdf
Instantel Minimate Report # BE14105, Feb 9 _18 13_10_04.pdf
Instantel Minimate Report # BE14105, Mar 2 _18 13_11_02.pdf
Instantel Minimate Report # BE14105, Mar 23 _18 12_29_52.pdf
Instantel Minimate Report # BE15010 Apr 19_18 12_21_58.pdf
Instantel Minimate Report # BE15010 May 3 _18 12_11_31.pdf
Instantel Minimate Report # BE15010 May 3 _18 12_11_31 USBM FatiguedBuilding.pdf
Instantel Minimate Report # BE14108 May 31 _18 13_11_13.pdf
Instantel Minimate Birdwood Tce Report # BE10031 May 31 _18 13_11_13.pdf
Instantel Minimate Report # BE14108, Jun 14 _18 13_13_32.pdf
Instantel Minimate Report # BE14108, Jun 21 _18 13_23_13.pdf